4 thoughts on “What are the processes and steps of exhibition hall design?”

  1. First, communicate in the early stage. Before doing it, you need to communicate with the design company of the exhibition hall to determine the positioning, address, area, budget, and the effect you want to achieve. Through preliminary communication, the exhibition hall design company will give some professional suggestions and opinions. This It is also necessary to provide some information about the company's design company about the company for reference.
    . Planning. According to the preliminary benign communication, the design company of the exhibition hall will make a planning plan for the enterprise exhibition hall to determine the main style and positioning of the enterprise exhibition hall. If the two parties do not have any objections, they can sign a contract.
    three, design. After the contract is signed, the planning outline is confirmed, and the exhibition hall design company arranges the effect map of the exhibition hall according to the outline, and improves the planning plan according to the data provided by the enterprise. At the same time, the multimedia project design is carried out.
    4. Construction. There are many problems involved in the construction phase, including the deepening of the renderings, the deepening of the plan, and the deepening of multimedia projects. At this time, in -depth communication is required.
    five, acceptance. The construction is completed, that is, the end wall of the art edition is over, the multimedia engineering debugging is successful, and the basic decoration is completed. After the enterprise has no other suggestions on the exhibition hall, it can be organized and accepted. After the acceptance, the end is to the exhibition design and construction company.
    6. Late maintenance. If there is a problem with the exhibition hall, such as a problem with multimedia machines, you can find the construction party to solve it.

  2. Answer: 1. Early communication and exchange Enterprise exhibition halls must have a certain grasp of the structure of the exhibition hall area, accurately measure the following specific size, and ask the technical professional exhibition hall design company to draw detailed graphic design drawings. It is mainly to understand the actual reasonable layout (including effective changes to the original structure) and the cost cost of the decoration price budget.

  3. The first is to understand the needs of Party A in the exhibition hall, then measure the actual venue, draw the renderings as required, and confirm that the construction drawing will be drawn later.

  4. 1. Communication in the early stage. Before doing it, you need to communicate with the design company of the exhibition hall to determine the positioning, address, area, budget, and the effect you want to achieve. Through preliminary communication, the exhibition hall design company will give some professional suggestions and opinions At this time, it is also necessary to provide some information about the company's design companies for reference.
    2. Planning. According to the preliminary benign communication, the design company of the exhibition hall will make a planning plan for the enterprise exhibition hall to determine the main style and positioning of the enterprise exhibition hall. If the two parties do not have any objections, they can sign a contract.
    3. Design. After the contract was signed, the planning outline was confirmed. According to the outline arrangement of the production hall renderings, the exhibition hall was arranged for the effect map of the exhibition hall, and the planning plan provided by the enterprise was performed. At the same time, the multimedia project design was carried out. At the same time, the construction team entered the field for basic decoration.
    4. Construction. There are many problems involved in the construction phase, including the deepening of the renderings, the deepening of the plan, and the deepening of multimedia projects. At this time, in -depth communication is required.

Shopping Cart